Energywise Equipment
Developers of renewable energy On-Grid and Off-Grid Power Plants, delivering cutting-edge solutions for sustainable and affordable energy
Our Wind & Solar Solutions
On Grid Installations
Full on-grid PV solar power plants providing power to Zimbabwe Electricity Transmission & Distribution Company (ZETDC) and other regional off-takers
Off Grid Installations
Off-grid power systems, ideal for properties not connected to or wishing to disconnect from the public electricity network.
Wind Generation
Full on-grid powerplants providing power to Zimbabwe Electricity Transmission & Distribution Company (ZETDC) and other regional off-takers.
Commercial & Industrial Installations
Expert assistance with every detail of site selection, system design, installation and commissioning.
Consultancy
Complete solar consultancy services from feasibility studies to project management and technical advisory.
Our Projects
Vungu Solar Power Station Phase 1 – 30 MW
Grid tied 30MWac solar power plant at late stage development and nearing financial close with anchor investor secured.
Vungu Solar Power Station Phase 2 – 30 MW
Building on the success of Phase 1, this expansion will add another 30MWac of capacity, further strengthening the region’s renewable energy infrastructure and supporting the growing energy demands of the country.
Runde River Solar Park 100MW
A landmark project, the Runde River Solar Park harnesses the power of the sun to produce 100MWac of clean energy. This large-scale installation supports both residential and commercial energy needs, promoting sustainable development in the region.
Lupane Solar Power Station 5 MW
This 5MWac solar power station has been providing reliable and clean energy to the Lupane area, playing a crucial role in meeting local energy requirements while fostering environmental sustainability.
Our Team
Culven Chipfumbu
Managing Director
Enock Ncube
Operations Director
A seasoned engineer and projects manager, Enock Ncube started his career in 1984 as an engineer in the Zimbabwe Electricity Supply Authority and served in various positions in the company such as District Engineer, District Manager, Chief Engineer, General Manager, Operations Director and Commercial Director and retired from the company in 2013 having served at executive level for 10 years. Enock Ncube served as a board member and Board Chairman of the Zimbabwe Electricity Industry Pension Fund from 2013 to 2024.
Muchineripi "Muchie" Francis Dembedza
Commercial Director
A businessman, marketer and experienced projects developer, Muchie is a shrewd negotiator and deal maker, with good contacts in the local Zimbabwean capital markets which are critical for the development and growth of Energywise Equipment.